MGC Central Control Room and MGC Administration Building

Fields of Activity:
Buildings
Clients:
Joint Operations (Kuwait Gulf Oil Co.-Saudi Arabia Texaco)
Contract No.:
JO/HC43R1/MP05
Project Value (KD):
5,195,482
Commencement Date:
Feb 28, 2007
Completion Date:
Feb 28, 2010
Project Description:
Design & Engineering including Preparation of Construction Drawings, Supply, Fabrication and Installation of:
  • New MGC Admin. Building with all Utility System including Electrical, HVAC, Water Supply, Drainage, Fire Protection;
  • Telephone and Computer System, Lighting and Power System, Asphalt Concrete Access Road, Sheltered Car Parking;
  • Fencing with Electrical Sliding Gate;
  • New MGC Central Room with all Utility System, as aforesaid;
  • Two (2) New Safe haven Rooms with all Facilities;
  • Modification/Facility Upgrade, including HVAC, of existing Control Rooms (7No.);
  • Chiller Plant;
  • Testing, Pre-Commissioning and Commissioning of all completed installations as a complete, Safe, Functional and Fully Operational System.