The scheme involves the design, detailed engineering, procurement, construction, installation and commissioning of high pressure smokeless pit flares at fourteen of KOC's crude oil gathering centres across the south and east of the country to combust the waste gas and achieve Ringelmann '0' level of flaring. It also includes the installation of a 4.5 kilometre long 30-inch pipeline along with all associated civil, structural, electrical & Instrumentation works.